Move 1 Green





 
Pip: 167
 
Pip: 167
 

# Ply Move Equity
  1 3 24/15 0.004
* 2 3 24/18 13/10 0.004 (-0.000)
  3 3 24/21 13/7 -0.035 (-0.038)
  4 3 24/18 24/21 -0.043 (-0.047)
  5 3 13/4 -0.060 (-0.064)


Move 1 White





 
Pip: 167
 
Pip: 158
 

# Ply Move Equity
* 1 3 24/15* 0.103
  2 3 24/21 13/7* -0.018 (-0.121)
  3 2 13/7* 13/10 -0.037 (-0.140)
  4 2 13/7*/4 -0.103 (-0.206)
  5 1 13/7* 6/3 -0.177 (-0.280)


Move 2 Green





 
Pip: 158
 
Pip: 173
 

# Ply Move Equity
  1 3 bar/24 13/9 -0.284
  2 3 bar/21 24/23 -0.294 (-0.010)
* 3 3 bar/20 -0.321 (-0.036)
  4 3 bar/24 18/14 -0.354 (-0.069)
  5 3 bar/21 6/5 -0.356 (-0.071)


Move 2 White





 
Pip: 158
 
Pip: 168
 

# Ply Move Equity
* 1 3 13/7* 6/5* 0.444
  2 3 13/7* 8/7 0.342 (-0.102)
  3 2 13/7*/6 0.159 (-0.285)
  4 2 15/8 0.125 (-0.319)
  5 1 15/14 13/7* 0.088 (-0.356)


Move 3 Green





 
Pip: 151
 
Pip: 180
 

# Ply Move Equity
* 1 1 bar/23(2) 24/20* -0.059
  2 1 bar/23(2) 6/4(2) -0.325 (-0.267)
  3 1 bar/21(2) -0.370 (-0.311)
  4 1 bar/23(2) 24/22 6/4 -0.519 (-0.460)
  5 1 bar/23(2) 13/11(2) -0.541 (-0.482)


Move 3 White





 
Pip: 171
 
Pip: 172
 

# Ply Move Equity
* 1 3 bar/22 7/5* 0.033
  2 3 bar/23 8/5* -0.058 (-0.091)
  3 3 bar/22 24/22 -0.063 (-0.096)
  4 3 bar/22 15/13 -0.084 (-0.117)
  5 2 bar/23 7/4 -0.116 (-0.150)


Move 4 Green





 
Pip: 166
 
Pip: 177
 

# Ply Move Equity
* 1 3 bar/15 -0.305
  2 3 bar/21 13/7 -0.392 (-0.087)
  3 3 bar/21 8/2 -0.426 (-0.121)


Move 4 White





 
Pip: 166
 
Pip: 167
 

# Ply Move Equity
* 1 3 15/9 8/5 0.312
  2 3 13/7 8/5 0.206 (-0.105)
  3 2 24/18 8/5 0.153 (-0.159)
  4 2 24/15 0.149 (-0.163)
  5 2 22/16 8/5 0.138 (-0.174)


Move 5 Green





 
Pip: 157
 
Pip: 167
 

# Ply Move Equity
* 1 2 23/16* -0.195
  2 2 15/8 -0.418 (-0.223)
  3 2 8/3*/1* -0.442 (-0.247)
  4 1 15/10 13/11 -0.495 (-0.300)
  5 1 15/13 6/1* -0.501 (-0.306)


Move 5 White





 
Pip: 173
 
Pip: 160
 

# Ply Move Equity
* 1 3 bar/18 0.040
  2 3 bar/24 13/7 -0.031 (-0.071)
  3 3 bar/24 22/16 -0.034 (-0.073)
  4 3 bar/24 8/2* -0.068 (-0.108)


Move 6 Green





 
Pip: 166
 
Pip: 160
 

# Ply Move Equity
* 1 3 15/11 13/11 -0.148
  2 3 8/4 6/4 -0.246 (-0.098)
  3 2 23/21 15/11 -0.282 (-0.134)
  4 2 13/7* -0.326 (-0.178)
  5 2 16/14 15/11 -0.360 (-0.212)


Move 6 White





 
Pip: 166
 
Pip: 154
 

# Ply Move Equity
* 1 3 13/9* 13/11 0.220
  2 3 18/16 13/9* 0.209 (-0.011)
  3 3 22/20 13/9* 0.205 (-0.015)
  4 3 24/22 13/9* 0.179 (-0.041)
  5 3 13/9*/7 0.118 (-0.102)


Move 7 Green





 
Pip: 160
 
Pip: 163
 

# Ply Move Equity
* 1 1 bar/16* 0.090
  2 1 bar/21 6/1* -0.263 (-0.353)
  3 1 bar/21 8/3* -0.304 (-0.394)
  4 1 bar/21 13/8 -0.332 (-0.422)
  5 1 bar/21 11/6 -0.638 (-0.728)


Move 7 White





 
Pip: 176
 
Pip: 154
 

# Ply Move Equity
* 1 3 bar/20 24/18 -0.180
  2 3 bar/20 11/5 -0.273 (-0.093)
  3 2 bar/20 8/2* -0.321 (-0.141)
  4 2 bar/20 22/16 -0.365 (-0.185)
  5 1 bar/20 13/7 -0.900 (-0.720)


Move 8 Green





 
Pip: 165
 
Pip: 154
 

# Ply Move Equity
* 1 2 8/5* 6/5 0.229
  2 2 23/22 16/13 0.019 (-0.211)
  3 1 6/3* 6/5* -0.044 (-0.273)
  4 1 16/13 6/5* -0.060 (-0.289)
  5 1 23/22 6/3* -0.187 (-0.417)


Move 8 White





 
Pip: 170
 
Pip: 150
 

# Ply Move Equity
* 1 3 bar/21 11/5 -0.300
  2 3 bar/21 22/16 -0.363 (-0.063)
  3 3 bar/15 -0.415 (-0.115)
  4 2 bar/21 8/2* -0.412 (-0.112)
  5 1 bar/21 13/7 -0.953 (-0.653)


Move 9 Green





 
Pip: 160
 
Pip: 150
 

# Ply Move Equity
  1 3 8/3* 6/3 0.274
  2 3 23/18 16/13 0.242 (-0.031)
* 3 3 16/8 0.218 (-0.055)
  4 3 16/11 6/3* 0.173 (-0.101)
  5 2 23/15 0.118 (-0.156)


Move 9 White





 
Pip: 160
 
Pip: 142
 

# Ply Move Equity
* 1 2 21/13 -0.176
  2 2 21/18 13/8 -0.344 (-0.168)
  3 2 21/16 5/2* -0.366 (-0.189)
  4 2 21/18 6/1 -0.367 (-0.191)
  5 2 13/8 13/10 -0.406 (-0.230)


Move 10 Green





 
Pip: 152
 
Pip: 142
 

# Ply Move Equity
  1 3 23/18 8/2 0.105
  2 3 11/5 11/6 0.083 (-0.022)
* 3 3 13/2 0.064 (-0.041)
  4 3 23/18 11/5 -0.009 (-0.115)
  5 3 13/8 11/5 -0.084 (-0.189)


Move 10 White





 
Pip: 152
 
Pip: 131
 

# Ply Move Equity
  1 3 22/16 -0.177
  2 3 22/21 13/8 -0.200 (-0.023)
* 3 3 13/8 6/5 -0.251 (-0.074)
  4 2 13/7 -0.293 (-0.116)
  5 2 13/8 5/4 -0.300 (-0.124)


Move 11 Green





 
Pip: 146
 
Pip: 131
 

# Ply Move Equity
* 1 3 23/21 6/5 0.083
  2 3 8/5 0.013 (-0.070)
  3 3 23/21 2/1 0.007 (-0.076)
  4 3 23/22 8/6 0.001 (-0.083)
  5 3 5/3*/2 -0.105 (-0.188)


Move 11 White





 
Pip: 146
 
Pip: 128
 

# Ply Move Equity
  1 3 8/4* -0.226
  2 3 13/10 5/4* -0.242 (-0.016)
  3 3 5/4*/1 -0.267 (-0.041)
* 4 3 22/18 -0.284 (-0.058)
  5 2 5/2 5/4* -0.342 (-0.116)


Move 12 Green





 
Pip: 142
 
Pip: 128
 

# Ply Move Equity
* 1 3 8/4 5/4 0.098
  2 3 5/1 2/1 0.073 (-0.025)
  3 3 6/2 5/4 0.047 (-0.051)
  4 3 8/3 0.019 (-0.079)
  5 2 8/4 2/1 -0.045 (-0.143)


Move 12 White





 
Pip: 142
 
Pip: 123
 

# Ply Move Equity
* 1 3 18/13 8/2 -0.213
  2 3 18/7 -0.306 (-0.092)
  3 2 13/7 13/8 -0.397 (-0.184)
  4 2 8/2 6/1 -0.431 (-0.218)
  5 2 13/2 -0.454 (-0.241)


Move 13 Green





 
Pip: 131
 
Pip: 123
 

# Ply Move Equity
* 1 3 21/15 0.198
  2 3 21/16 6/5 0.176 (-0.022)
  3 3 21/16 2/1 0.143 (-0.055)
  4 3 21/16 5/4 0.075 (-0.123)
  5 3 6/1 2/1 0.068 (-0.131)


Move 13 White





 
Pip: 131
 
Pip: 117
 

# Ply Move Equity
* 1 2 13/10* -0.171
  2 2 5/2 -0.418 (-0.248)
  3 2 6/4 5/4 -0.420 (-0.250)
  4 2 5/3 5/4 -0.429 (-0.258)
  5 2 8/6 5/4 -0.438 (-0.268)


Move 14 Green





 
Pip: 128
 
Pip: 127
 

# Ply Move Equity
* 1 1 Can't move -0.272


Move 14 White