Move 1 Green





 
Pip: 194
 
Pip: 194
 

# Ply Move Equity
* 1 3 8/4 6/4 0.043
  2 3 24/20 23/21 0.010 (-0.033)
  3 3 24/18 -0.006 (-0.049)
  4 2 24/20 24/22 -0.010 (-0.053)
  5 2 24/20 13/11 -0.013 (-0.056)


Move 1 White





 
Pip: 194
 
Pip: 188
 

# Ply Move Equity
* 1 3 24/18 24/22 -0.074
  2 3 24/18 13/11 -0.088 (-0.014)
  3 3 24/16 -0.104 (-0.030)
  4 2 24/18 8/6 -0.127 (-0.053)
  5 2 24/18 6/4 -0.151 (-0.078)


Move 2 Green





 
Pip: 186
 
Pip: 188
 

# Ply Move Equity
* 1 3 8/7* 6/3* 0.034
  2 3 8/5 6/5 0.019 (-0.015)
  3 3 24/21 23/22 0.018 (-0.016)
  4 2 23/20 23/22 0.011 (-0.024)
  5 2 24/20 0.003 (-0.031)


Move 2 White





 
Pip: 196
 
Pip: 184
 

# Ply Move Equity
* 1 3 bar/23(2) 6/4(2) 0.006
  2 3 bar/23(2) 13/11(2) -0.041 (-0.047)
  3 2 bar/23(2) 13/9 -0.080 (-0.085)
  4 1 bar/23(2) 13/11 8/6 -0.127 (-0.132)
  5 1 bar/23(2) 13/11 6/4 -0.156 (-0.162)


Move 3 Green





 
Pip: 188
 
Pip: 184
 

# Ply Move Equity
* 1 3 24/18 7/3 -0.015
  2 3 24/20 13/7 -0.096 (-0.081)
  3 2 13/7 8/4 -0.088 (-0.074)
  4 2 13/3 -0.095 (-0.081)
  5 1 13/7 13/9 -0.142 (-0.127)


Move 3 White





 
Pip: 188
 
Pip: 174
 

# Ply Move Equity
* 1 3 13/9 8/7* -0.075
  2 3 13/8 -0.119 (-0.044)
  3 3 8/7*/3 -0.131 (-0.056)
  4 2 8/4 8/7* -0.200 (-0.125)
  5 1 8/3 -0.261 (-0.186)


Move 4 Green





 
Pip: 183
 
Pip: 181
 

# Ply Move Equity
* 1 3 bar/20 -0.063
  2 3 bar/24 13/9 -0.088 (-0.025)
  3 2 bar/24 8/4 -0.151 (-0.088)


Move 4 White





 
Pip: 183
 
Pip: 176
 

# Ply Move Equity
* 1 2 23/17* 9/5* 0.180
  2 2 23/17* 13/9 0.036 (-0.143)
  3 1 13/7 9/5* 0.027 (-0.152)
  4 1 13/7 13/9 0.013 (-0.167)
  5 1 23/17*/13 -0.017 (-0.197)


Move 5 Green





 
Pip: 173
 
Pip: 198
 

# Ply Move Equity
* 1 1 bar/24 -0.330


Move 5 White





 
Pip: 173
 
Pip: 197
 

# Ply Move Equity
* 1 2 17/16 7/5 0.369
  2 2 8/5 0.263 (-0.106)
  3 1 8/6 8/7 0.097 (-0.272)
  4 1 17/15 7/6 0.062 (-0.307)
  5 1 17/15 8/7 0.057 (-0.312)


Move 6 Green





 
Pip: 170
 
Pip: 197
 

# Ply Move Equity
  1 3 bar/22 24/18 -0.310
  2 3 bar/16 -0.359 (-0.049)
* 3 3 bar/22 13/7 -0.403 (-0.093)


Move 6 White





 
Pip: 170
 
Pip: 188
 

# Ply Move Equity
* 1 2 16/10 0.312
  2 2 16/14 13/9 0.242 (-0.070)
  3 2 13/7 0.149 (-0.163)
  4 1 8/4 8/6 0.146 (-0.166)
  5 1 13/9 13/11 0.142 (-0.170)


Move 7 Green





 
Pip: 164
 
Pip: 188
 

# Ply Move Equity
* 1 3 24/22 7/6 -0.358
  2 3 23/22 7/5 -0.386 (-0.029)
  3 3 24/22 23/22 -0.405 (-0.048)
  4 2 13/11 7/6 -0.403 (-0.045)
  5 2 23/22 13/11 -0.415 (-0.057)


Move 7 White





 
Pip: 164
 
Pip: 185
 

# Ply Move Equity
* 1 3 13/11 10/6 0.258
  2 3 13/9 10/8 0.240 (-0.018)
  3 3 10/4 0.240 (-0.018)
  4 2 13/7 0.144 (-0.114)
  5 1 8/4 8/6 0.122 (-0.136)


Move 8 Green





 
Pip: 158
 
Pip: 185
 

# Ply Move Equity
* 1 3 23/18(2) 13/8(2) -0.093
  2 3 23/13 13/8(2) -0.145 (-0.052)
  3 3 23/13(2) -0.180 (-0.086)
  4 2 23/18(2) 13/3 -0.225 (-0.131)
  5 2 23/18(2) 18/8 -0.264 (-0.170)


Move 8 White





 
Pip: 158
 
Pip: 165
 

# Ply Move Equity
  1 3 23/20 13/12* 0.127
* 2 3 13/12* 11/8 0.080 (-0.047)
  3 3 13/12*/9 0.066 (-0.061)
  4 2 13/10 13/12* 0.082 (-0.045)
  5 2 23/20 11/10 0.039 (-0.088)


Move 9 Green





 
Pip: 154
 
Pip: 177
 

# Ply Move Equity
* 1 3 bar/22 18/12* 0.032
  2 3 bar/22 24/18 -0.026 (-0.057)
  3 1 bar/16 -0.142 (-0.173)


Move 9 White





 
Pip: 166
 
Pip: 168
 

# Ply Move Equity
  1 3 bar/24 23/20 -0.022
* 2 3 bar/24 8/5 -0.123 (-0.101)
  3 2 bar/24 12/9 -0.140 (-0.118)
  4 1 bar/24 4/1* -0.312 (-0.290)
  5 1 bar/24 5/2 -0.403 (-0.381)


Move 10 Green





 
Pip: 162
 
Pip: 168
 

# Ply Move Equity
  1 3 22/16 18/16 0.103
* 2 3 24/18 12/10 0.065 (-0.038)
  3 2 24/18 6/4 0.034 (-0.069)
  4 1 22/14 0.008 (-0.095)
  5 1 24/22 18/12 -0.003 (-0.105)


Move 10 White





 
Pip: 162
 
Pip: 160
 

# Ply Move Equity
* 1 1 23/15* 0.151
  2 1 23/18 5/2 -0.146 (-0.298)
  3 1 23/18 23/20 -0.151 (-0.303)
  4 1 23/18 12/9 -0.185 (-0.337)
  5 1 23/18 8/5 -0.224 (-0.375)


Move 11 Green





 
Pip: 154
 
Pip: 175
 

# Ply Move Equity
* 1 1 bar/18 -0.077
  2 1 bar/22 18/14 -0.294 (-0.216)
  3 1 bar/22 8/4 -0.339 (-0.261)


Move 11 White





 
Pip: 154
 
Pip: 168
 

# Ply Move Equity
  1 3 23/18 12/11 -0.021
  2 3 24/18 -0.030 (-0.009)
* 3 3 12/6 -0.032 (-0.011)
  4 2 23/18 15/14 -0.039 (-0.018)
  5 2 23/18 5/4 -0.071 (-0.051)


Move 12 Green





 
Pip: 148
 
Pip: 168
 

# Ply Move Equity
* 1 3 18/10* 0.154
  2 3 22/16 18/16 0.076 (-0.078)
  3 1 22/14 0.013 (-0.141)
  4 1 22/16 6/4 -0.047 (-0.201)
  5 1 18/12 6/4 -0.097 (-0.251)


Move 12 White





 
Pip: 158
 
Pip: 160
 

# Ply Move Equity
* 1 3 bar/14 -0.081
  2 3 bar/20 24/18 -0.112 (-0.031)
  3 1 bar/20 8/2 -0.298 (-0.217)


Move 13 Green





 
Pip: 147
 
Pip: 160
 

# Ply Move Equity
* 1 1 18/11* 0.185
  2 1 10/3 -0.087 (-0.273)
  3 1 18/13 10/8 -0.087 (-0.273)
  4 1 18/16 6/1* -0.107 (-0.292)
  5 1 10/8 6/1* -0.112 (-0.297)


Move 13 White





 
Pip: 158
 
Pip: 153
 

# Ply Move Equity
* 1 3 bar/23 8/7* -0.182
  2 3 bar/24 6/4 -0.222 (-0.041)
  3 2 bar/23 24/23 -0.293 (-0.111)
  4 2 bar/23 6/5 -0.295 (-0.114)
  5 1 bar/23 5/4 -0.343 (-0.161)


Move 14 Green





 
Pip: 155
 
Pip: 160
 

# Ply Move Equity
* 1 3 bar/22 10/8 0.114
  2 3 bar/23 11/8 0.092 (-0.023)
  3 3 bar/22 11/9 0.076 (-0.038)
  4 2 bar/22 6/4 0.031 (-0.083)
  5 1 bar/23 6/3 -0.052 (-0.167)


Move 14 White





 
Pip: 155
 
Pip: 155
 

# Ply Move Equity
  1 3 24/20 23/20 -0.083
* 2 3 8/4 7/4 -0.319 (-0.237)
  3 1 23/16 -0.190 (-0.107)
  4 1 23/20 8/4 -0.261 (-0.179)