Move 1 Green





 
Pip: 194
 
Pip: 194
 

# Ply Move Equity
  1 3 23/22 13/8 -0.005
  2 3 24/18 -0.006 (-0.001)
* 3 3 23/18 23/22 -0.007 (-0.002)
  4 2 24/23 13/8 -0.036 (-0.031)
  5 2 13/8 6/5 -0.066 (-0.060)


Move 1 White





 
Pip: 194
 
Pip: 188
 

# Ply Move Equity
* 1 2 13/7* 8/7 0.067
  2 2 13/7*/6 -0.025 (-0.093)
  3 2 23/22 13/7* -0.029 (-0.096)
  4 2 24/18 23/22 -0.039 (-0.107)
  5 2 24/18 8/7* -0.040 (-0.107)


Move 2 Green





 
Pip: 187
 
Pip: 195
 

# Ply Move Equity
* 1 3 bar/23 6/5(2) 0.026
  2 3 bar/24 22/21 6/5(2) 0.011 (-0.015)
  3 2 bar/24 8/7 6/5(2) -0.085 (-0.111)
  4 2 bar/22 24/23 -0.087 (-0.113)
  5 2 bar/21 -0.101 (-0.127)


Move 2 White





 
Pip: 187
 
Pip: 191
 

# Ply Move Equity
  1 3 24/18 23/21 -0.032
  2 3 24/18 24/22 -0.051 (-0.018)
  3 3 24/16 -0.061 (-0.028)
* 4 3 23/21 13/7 -0.065 (-0.032)
  5 2 23/15 -0.066 (-0.033)


Move 3 Green





 
Pip: 179
 
Pip: 191
 

# Ply Move Equity
* 1 3 22/11 0.023
  2 3 22/16 13/8 0.006 (-0.017)
  3 3 13/2* -0.057 (-0.079)
  4 2 22/16 8/3 -0.081 (-0.104)
  5 1 13/7 13/8 -0.117 (-0.140)


Move 3 White





 
Pip: 179
 
Pip: 180
 

# Ply Move Equity
* 1 2 24/18 21/18 0.041
  2 2 24/18 24/21 -0.062 (-0.103)
  3 2 24/15 -0.099 (-0.140)
  4 1 24/21 13/7 -0.156 (-0.197)
  5 1 24/21 8/2* -0.219 (-0.260)


Move 4 Green





 
Pip: 170
 
Pip: 180
 

# Ply Move Equity
* 1 3 24/21(2) 13/10(2) 0.013
  2 3 24/21(2) 23/20 11/8 -0.001 (-0.014)
  3 3 24/21(2) 11/5 -0.019 (-0.032)
  4 2 24/21 13/10(2) 11/8 -0.014 (-0.028)
  5 2 24/21 23/20 13/10(2) -0.020 (-0.033)


Move 4 White





 
Pip: 170
 
Pip: 168
 

# Ply Move Equity
* 1 3 24/21 23/18 -0.028
  2 3 24/16 -0.064 (-0.035)
  3 3 23/18 6/3 -0.069 (-0.041)
  4 2 24/21 7/2* -0.143 (-0.114)
  5 2 24/21 6/1 -0.164 (-0.136)


Move 5 Green





 
Pip: 162
 
Pip: 168
 

# Ply Move Equity
* 1 3 23/22 11/6 0.014
  2 3 21/16 11/10 0.000 (-0.014)
  3 3 11/5 -0.005 (-0.020)
  4 2 11/10 8/3 -0.020 (-0.034)
  5 2 23/22 21/16 -0.044 (-0.058)


Move 5 White





 
Pip: 162
 
Pip: 162
 

# Ply Move Equity
* 1 3 13/1(2) -0.103
  2 3 13/7(2) 8/2(2) -0.151 (-0.048)
  3 1 8/2(2) 7/1(2) -0.275 (-0.172)
  4 1 13/1 8/2(2) -0.284 (-0.181)
  5 1 13/7(2) 7/1 8/2 -0.365 (-0.261)


Move 6 Green





 
Pip: 138
 
Pip: 162
 

# Ply Move Equity
* 1 3 22/20 8/6 6/4*(2) 0.174
  2 3 10/6 6/4*(2) 0.142 (-0.031)
  3 2 8/4*(2) 0.121 (-0.053)
  4 2 13/11 8/6 6/4*(2) 0.112 (-0.061)
  5 1 13/11(2) 8/4* 0.042 (-0.131)


Move 6 White





 
Pip: 142
 
Pip: 154
 

# Ply Move Equity
* 1 3 bar/22 7/2 -0.194
  2 3 bar/22 6/1 -0.221 (-0.026)
  3 3 bar/22 18/13 -0.228 (-0.034)
  4 1 bar/22 8/3 -0.378 (-0.184)


Move 7 Green





 
Pip: 134
 
Pip: 154
 

# Ply Move Equity
* 1 3 20/10 0.167
  2 3 20/14 10/6 0.156 (-0.011)
  3 3 13/3* 0.138 (-0.029)
  4 2 21/15 20/16 0.152 (-0.015)
  5 2 20/16 10/4 0.142 (-0.025)


Move 7 White





 
Pip: 134
 
Pip: 144
 

# Ply Move Equity
* 1 3 22/18 2/1 -0.154
  2 3 22/18 6/5 -0.181 (-0.027)
  3 2 22/18 8/7 -0.259 (-0.105)
  4 1 22/18 7/6 -0.303 (-0.149)
  5 1 6/2 6/5 -0.303 (-0.149)


Move 8 Green





 
Pip: 129
 
Pip: 144
 

# Ply Move Equity
  1 3 21/16 10/8 0.147
* 2 3 10/3 0.138 (-0.009)
  3 3 8/3 8/6 0.122 (-0.025)
  4 2 21/14 0.126 (-0.021)
  5 2 10/5 10/8 0.111 (-0.036)


Move 8 White





 
Pip: 129
 
Pip: 137
 

# Ply Move Equity
* 1 1 18/11 -0.087
  2 1 8/3 8/6 -0.247 (-0.160)
  3 1 18/13 18/16 -0.271 (-0.183)
  4 1 18/16 6/1 -0.307 (-0.220)
  5 1 7/2 7/5 -0.307 (-0.220)


Move 9 Green





 
Pip: 122
 
Pip: 137
 

# Ply Move Equity
  1 3 10/6(2) 0.043
  2 3 8/6(2) 6/2 0.038 (-0.006)
  3 3 10/8(2) 8/6 5/3 0.035 (-0.008)
  4 3 10/8(2) 8/4 0.030 (-0.013)
* 5 3 13/9(2) -0.052 (-0.095)


Move 9 White





 
Pip: 122
 
Pip: 129
 

# Ply Move Equity
* 1 3 11/8 -0.003
  2 3 6/3 -0.065 (-0.063)
  3 2 8/6 8/7 -0.136 (-0.134)
  4 1 7/5 6/5 -0.146 (-0.144)
  5 1 7/5 7/6 -0.252 (-0.249)


Move 10 Green





 
Pip: 119
 
Pip: 129
 

# Ply Move Equity
  1 3 9/5 9/6 -0.031
  2 3 8/4 8/5 -0.045 (-0.014)
* 3 3 10/3 -0.053 (-0.021)
  4 3 6/2 6/3 -0.074 (-0.043)
  5 2 9/2 -0.084 (-0.053)


Move 10 White





 
Pip: 119
 
Pip: 122
 

# Ply Move Equity
* 1 3 18/14 8/3 0.011
  2 3 18/13 6/2 -0.012 (-0.022)
  3 3 8/3 6/2 -0.039 (-0.050)
  4 2 18/14 6/1 -0.062 (-0.073)
  5 2 7/2 7/3 -0.083 (-0.093)


Move 11 Green





 
Pip: 110
 
Pip: 122
 

# Ply Move Equity
* 1 3 21/15 10/8 -0.024
  2 3 8/2 8/6 -0.070 (-0.045)
  3 3 8/2 4/2 -0.088 (-0.063)
  4 2 10/4 8/6 -0.061 (-0.036)
  5 2 10/2 -0.065 (-0.040)


Move 11 White





 
Pip: 110
 
Pip: 114
 

# Ply Move Equity
  1 3 18/15(2) 14/8 0.219
* 2 3 14/11 7/4*(2) 6/3 0.193 (-0.025)
  3 2 7/4*(2) 6/3(2) 0.167 (-0.052)
  4 1 18/15 7/4*(2) 6/3 0.062 (-0.156)
  5 1 14/8 6/3(2) 0.047 (-0.171)


Move 12 Green





 
Pip: 98
 
Pip: 118
 

# Ply Move Equity
* 1 1 Can't move -0.468


Move 12 White





 
Pip: 98
 
Pip: 118
 

# Ply Move Equity
  1 3 18/12 0.236
  2 3 11/7 6/4 0.204 (-0.032)
  3 3 8/4 8/6 0.156 (-0.080)
* 4 3 18/14 11/9 0.143 (-0.093)
  5 2 11/7 8/6 0.174 (-0.062)


Move 13 Green





 
Pip: 92
 
Pip: 118
 

# Ply Move Equity
* 1 2 bar/20 8/5 -0.283
  2 2 bar/20 15/12 -0.409 (-0.126)
  3 1 bar/20 9/6 -0.476 (-0.193)
  4 1 bar/20 5/2 -0.476 (-0.193)
  5 1 bar/20 4/1 -0.484 (-0.200)


Move 13 White





 
Pip: 92
 
Pip: 110
 

# Ply Move Equity
  1 3 9/5* 8/5 0.454
  2 3 18/14 9/6 0.434 (-0.020)
* 3 3 18/15 14/10* 0.346 (-0.108)
  4 1 14/10* 8/5* 0.266 (-0.188)
  5 1 14/10* 9/6 0.238 (-0.216)


Move 14 Green





 
Pip: 85
 
Pip: 120
 

# Ply Move Equity
  1 3 bar/23 20/14 -0.546
* 2 3 bar/23 8/2 -0.603 (-0.057)
  3 3 bar/23 9/3 -0.611 (-0.065)


Move 14 White




<